Thursday, July 31, 2025

Portfolio 3 Week 4 Final Turn In

 This is what I have for this turn in, unfortunately between Tuesday and Thursday there was no time to make any substantial changes as preparation for capstone and industry review presentations were underway. Rest assured I will be continuing to work on this sword after the turn-in. 

Week 1 - Block out primary shapes

Week 2 - Blockout secondary shapes

Week 3 1/2 - (Begin adding Tertiary shapes (metalwork, scratches, beat-up, weathering)



Wednesday, July 30, 2025

Physical Fabrication Projects

 

Physical Fabrication Projects

  • Stickers I made



Art print for hall



Resin print (i gotta get that all cleaned up but the print is pretty good)

I Dont have the filament print right now. this is all I have.









Monday, July 28, 2025

Portfolio 3 Week 3

 Week 1 - Blockout primary shapes

Weel 2 - Blockout secondary shapes

Week 3 - Tertiary and refinement 









Final Delivery

 This last sprint I tweaked the textures of my character to align more with Beryls drums. A lot of time was spent reposing my character because I did some steps out of order with the character creator - zbrush pose pipeline. Even after that I still ran into issues with zbrush not preserving my characters UVs after I sculpted all the detail onto the model. So with that being said this is where my character has landed. 







and here is some food if you are hungry 

Monday, July 21, 2025

Portfolio 3 Week 2 Mid Project

Week 1 - Blockout

Weel 2 - Highpoly and retopo

Week 3 - Textures and lookdev








Wednesday, July 16, 2025

Sprint #5 Delivery

I finished the UVs, posed and got an inital texture pass down for the Raijin character. Yayyyyyyyyy.

\






















Monday, July 14, 2025

Portfolio 3 Start

 For this project I am modeling the middle sword in these concept drawings

Week 1 - Blockout

Weel 2 - Highpoly and retopo

Week 3 - Textures and lookdev










Portfolio 3 Week 4 Final Turn In

 This is what I have for this turn in, unfortunately between Tuesday and Thursday there was no time to make any substantial changes as prepa...